1 / 5
Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.
Designed and fabricated in-factory with strict quality control. The fabrication process includes design, engineering, and manufacturing at the factory.
All steel components are fabricated at the factory and linked by bolts at the site. The process is fast, step-by-step, and easy to install.
Steel buildings are flexible in design, easy to expand in the future, and economically efficient with low transportation costs.
A green solution for the environment with CO2 reduction, energy efficiency, and high recyclability.
| Item | Materials | Remark |
|---|---|---|
| Steel Frame | H section column and beam, Roof/Wall purline | Q345/Q235 steel, paint or galvanization |
| Supporting System | Tie bar, Knee brace, Horizontal/Vertical bracing | Q235 round steel/angle steel |
| Roof & Wall System | Wall and roof panel, Ridge tile, Gutter | Corrugated steel sheet/sandwich panel |
| Fastener System | Anchor bolts, Bolts, Nuts | Q235 steel |