🔹 Basic Information
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Living House
Transport
Material with Proper Package Before Loading
Specification
Section steels customized
Capacity
400,000 Cubic Meter
💎 Product Display
❓ Frequently Asked Questions
How long does it take to produce the construction system?
Generally, 30 days are required to produce a villa or a steel structure building (warehouse) after confirming the architectural drawings. This timeline is clearly indicated in every quote.
How many containers are required for a typical project?
After confirming your request, we calculate the weight and dimensions of all materials. In general, a 40-foot container is required for a building with an area of 80m², though this varies depending on the specific house design.
What information is needed to receive a formal quote?
After your initial inquiry, we will provide you with a comprehensive questionnaire. Filling out this array ensures we have all the technical data needed to give you an accurate price.
Is on-site installation support available internationally?
Yes, we can arrange for an engineer to travel to your country to provide on-site support and training for your local workers, ensuring they are equipped for current and future projects.
How resistant are these buildings to natural disasters?
The modular steel frame system is designed for critical conditions. These buildings can withstand earthquakes of level 5-6 on the Richter scale and cyclones with sustained winds up to 40m/s.
Can the steel structure specifications be customized?
Absolutely. All section steels and architectural specifications are fully customizable to meet the specific functional and environmental requirements of your project.