• Earthquake resistance: Withstands magnitude 9 rare earthquakes.
• Wind resistance: Withstands hurricanes up to 70m/s (Level 12+).
• Fire resistance: 1 to 4 hours rating based on design.
• Durability: Main structure service life over 90 years.
• Construction period: Saves 2/3 of time compared to traditional structures.
• Energy saving: Saves 65% energy for heating and cooling.


• Sound insulation: Exterior wall 65dB, Interior wall 45dB.
• Thermal insulation: 11 times better than equal thickness brick walls.
• Environmental: 100% recyclable steel structure materials.
• House rate: Increases usable area by 5% to 13% vs traditional buildings.
• Application: Office, resort, school, dormitory, post-war reconstruction, and more.


| Applications | Office, toilet, bathroom, changing room, school, classroom, library, shop, meeting room, canteen, guard house, camp dormitory, camp hotel, playground castle, resort area, earthquake relief materials, post-war reconstruction materials, etc. |
| Core Advantages | Fast installation (4-8 hours/set/person), Anti-rust galvanized steel, Grade A fireproof rating, Fully waterproof ceiling and floors. |
Stringent factory processing and on-site construction according to national and industry standards to meet specific user needs.
Construction Flow
Equipped with pre-installed wall panels and trusses. Includes moisture-proof paper, insulation, windows, and exterior cladding.
On-Site Installation
Two types of systems: panelized and knock-down/stick-built for fast and economical assembly.



As a comprehensive enterprise integrating trade and manufacturing, we leverage multiple advanced factories to establish a robust production and supply system. Our focus remains on delivering high-quality integrated housing products and services to global customers.
The core business includes research, development, production, and sales of container houses, light steel prefabricated houses, large-scale steel structure factories, and modular K and T houses. With advanced equipment and stringent quality control, our products are exported to Europe, Africa, Southeast Asia, the Middle East, and other regions, earning widespread acclaim.